超薄肉色丝袜一区二区-超薄丝袜足j好爽在线-超薄丝袜足j好爽在线观看-超黄视频网站-超激情碰碰碰啪在线视频-超级极品白嫩美女在线

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://m.hualeseeds.cn

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 亚洲精品乱码久久久久久v 亚洲精品乱码久久久久久麻豆 | 91模特 | 毛片视频播放 | 逆天至尊免费看229集 | 真实的国产乱xxxx在线播放 | 日本免费黄色小视频 | 国产成人看片免费视频观看 | 国产成人爱片免费观看视频 | 久久久国产精品福利免费 | 97久久国语露脸精品对白 | 香港a毛片免费全部播放 | 在线久综合色手机在线播放 | 日本不卡在线观看免费v | 深夜成人影院 | 91精品久久久久久久久久 | 久久国产一区二区三区 | 欧美一级欧美三级在线观看 | 中文字幕av在线 | 国产视频在线播放 | 国产精品在线观看 | 久久这里只有精品免费视频 | 国产一区二区三区欧美精品 | 亚洲国产人久久久成人精品网站 | 四虎永久免费884hutv | 在线观看91精品国产不卡免费 | 婷婷四房综合激情五月性色 | 国产99页| 亚洲精品高清久久 | 亚洲精品久久久久久动漫剧情 | 亚洲综合在线另类色区奇米 | 久久久久欧美精品 | 国产欧美成人免费观看视频 | 欧美片欧美日韩国产综合片 | 欧美亚洲国产人成aaa | 久久精品国产国产精品四凭 | 亚洲69av| 国产羞羞事1000部在线观看 | 国产高清视频免费 | oldwoman中国老女人tv | 久久桃花| 亚洲免费人成在线视频观看 |